What a house costs after it is finished

The purchase price is the smaller number. Here is the one nobody puts in the brochure.

Residences10 min read
What a house costs after it is finished

A second house in the sun has a running cost of between two and four and a half per cent of its value every year, and almost none of it is optional. On a two million euro villa that is somewhere between forty and ninety thousand euro to own a house you are in for eight weeks.

The line items, honestly

The numbers below are for a 350 square metre villa with a pool and a garden in southern Europe, used personally, not let. They come from actual annual accounts rather than agents' estimates, which are consistently about forty per cent light.

Property tax and local charges
2,500 to 9,000 euro depending on country and valuation
Buildings and contents insurance
2,000 to 5,500 euro, more on the coast
Gardener, two days a week
9,000 to 16,000 euro
Pool service, year round
1,800 to 3,600 euro
Pool heating and plant electricity
600 to 2,900 euro depending on season length
Housekeeping and laundry
6,000 to 20,000 euro
Utilities on an empty house
2,400 to 6,000 euro; standing charges and frost protection do not care that you are away
Maintenance reserve
1 to 1.5 per cent of build cost a year, which nobody puts aside and everybody eventually spends
Management or keyholder
2,400 to 7,000 euro if you are not there

The three costs that surprise people

Empty-house utilities

A closed house still runs a dehumidifier, a frost line, a pool pump, an alarm, a router and a fridge. Standing charges on water, power and gas continue regardless. Two to six thousand a year buys you nothing at all except the house not deteriorating, and it is invisible in every purchase calculation.

The maintenance reserve nobody makes

External render, pool lining, flat roof membrane, terrace waterproofing, shutters, gates, irrigation, pumps. Each has a life between eight and twenty-five years, and on a house of any size at least one of them is due every year. One to one and a half per cent of the build cost annually is the honest reserve. Skip it for six years and the seventh year arrives with a bill for all of it at once.

The cost of not being there

Everything is more expensive when you are absent. Trades charge for the visit as well as the work. Deliveries need somebody. A leak found on day one costs a plumber, and the same leak found in week six costs a floor. Budget for a person whose job is to open the house, or budget for the consequences of not having one.

Where the savings actually are

Not in the gardener, and not in the housekeeper, both of whom are protecting an asset. The real savings are structural and are made once.

  • A pool cover. It halves evaporation, halves heating and roughly halves chemistry. It is the single highest-return object you can buy for a house with a pool.
  • Irrigation on a controller with a rain sensor and a leak cut-off. It pays for itself the first time a line fails in August while nobody is there.
  • Planting chosen for the climate rather than for the first photograph. A lawn in Andalucía is a permanent monthly invoice.
  • One good survey before purchase. Two thousand euro that regularly finds fifty.

Where a typical annual budget actually goes

People: garden, house, pool42%
Fixed charges: tax, insurance, standing utilities24%
Maintenance reserve20%
Energy in use14%

The letting question

Letting the house for eight to twelve weeks covers most of this, and changes what the house is. Rental-grade means contract furniture, duplicate everything, a lock-off owner's store, a management company at twenty to thirty per cent of gross, and the acceptance that some weeks somebody will break something you liked.

The arithmetic works. Whether it is worth it depends on a question that has nothing to do with money: whether you want to walk into your own house in June and find it exactly as you left it in September.

Use it now

Running Costs

What a house in the sun costs every year once it is finished.

Open the studio

Read next

The plan before the viewResidences

The plan before the view

Every expensive house on a beautiful site makes the same mistake, and it is made in the first week of design.